You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

This following diagram shows a high-level flow of the SBC 5400 installation sequence, from rack mounting the SBC chassis to placing your first call.

SBC 5400 Install Flowchart

Click a link below to go to an installation task based upon your SBC type and configuration options:

  1. Rack mount the chassis:
    1. Rack Mounting the SBC 5400 Chassis
  2. Connect Ethernet and data cables:
    1. Connecting SBC 5400 Ethernet and Data Cables
  3. Connect power to SBC and power on:
    1. Connecting Power to SBC 5400 and Powering On
  4. Upgrade BMC firmware (if required):

    Since, this is a fresh installation, BMC Firmware can not be upgraded.

  5. Configure SBC platform (BMC, management interfaces, NTP): <Add the link here>
  6. Install SecureLink for Remote Access <Add the link here>
  7. Installing SBC 5400 Application. <Add the link here>
  8. Configure SBC 5400 for a basic call flow and make first call. <Add the link here>


  • No labels