In this section:
This section provides details for mounting SBC 5400 chassis in 19 inch 2-post rack.
The 2-post installation only applies when mounting the chassis using the center brackets.
Align the bottom of the Rack Mount Bracket with the mark on front rail of the rack and secure loosely with (2) #10-32X5/8" Cup Head screws at the top-most and at the bottom-most racking slots. Repeat the same procedure for rear Rack Mount Bracket and the opposite side.
Position Rack Rail Guide by centering the center-line etched in the Rack Rail Guide in the center of the rack and secure with (4) #8-32X1/4" Truss Head screws through each Rack Mount Bracket, repeat for the opposite side.
Due to the size and weight of the system, never attempt to install the system by yourself.
For racks with #12-24, open square, or open round holes, slide #10-32 U-Nut over rail and align concentric with top-most and bottom-most mounting holes with nut portion protruding from inside surface of rail.