You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

In this section:

Overview

The

Unable to show "metadata-from": No such page "_space_variables"
front Bezel is a Customer Replaceable Unit (CRU). The purpose of the Bezel is to encase the replaceable air filter and to identify the LED status indicators (Power, Status, Active, Alarm, Locator) on the front panel of the chassis, as shown in the figure SBC 5400 Bezel. The Bezel product code is SBC-5400-BEZEL.

SBC 5400 Bezel

Parts and Tools Required

  • Electrostatic discharge (ESD) strap
  • Replacement Bezel (if swapping out the Bezel)

 

To prevent damage from electrostatic discharge, an ESD strap is provided in the accessory kit. See Connecting ESD Wrist Strap to install it.

 

Removing/Replacing the Bezel

The Bezel can be removed with power applied to SBC chassis, hence do not shut down the SBC to remove the Bezel.

Perform the following procedure to replace the Bezel:

  1. Locate the tab on the left side of the Bezel and pull back on Bezel until the left ball stud mounts disengage from the chassis.

    Locating the tab on the Bezel

    Disengaging Bezel from the SBC 5400 chassis

  2. Grasp the right-side of the Bezel and pull the Bezel away from the chassis until the right ball stud mounts disengage from the chassis.

    Pulling out the Bezel from the chassis

  3. Install the replacement Bezel assembly by aligning the ball stud mounts to the receiving sockets, and then gently push the Bezel until it is secured to the chassis.

CRU Storage

All 

Unable to show "metadata-from": No such page "_space_variables"
CRUs are shipped in electrostatic discharge bags and should be handled using appropriate ESD precautions.

The storage environment for the CRUs are:

  • Humidity must be less than 95% (non-condensing)
  • Temperature must be between -40C and +70C

 

  • No labels