You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

This following diagram shows a high-level flow of the 

Unable to show "metadata-from": No such page "_space_variables"
and
Unable to show "metadata-from": No such page "_space_variables"
installation sequence, from rack mounting the SBC chassis to placing your first call.

Installation Sequence

Click a link below to go to an installation task based upon your SBC type and configuration options:

  1. Rack mount the chassis:
    1. Rack Mounting the SBC 5000 Series Chassis
    2. Rack Mounting the SBC 7000 Series Chassis

  2. Connect Ethernet and data cables:
    1. Connecting SBC 5000 Series Ethernet and Data Cables
    2. Connecting SBC 7000 Series Ethernet and Data Cables

  3. Connect power to SBC and power on:
    1. Connecting Power to SBC 5000 Series and Powering On
    2. Connecting Power to SBC 7000 Series and Powering On

  4. Upgrade BMC firmware (if required):
    1. Upgrading SBC 5000 Series Firmware
    2. Upgrading SBC 7000 Series Firmware

  5. Configure SBC platform (BMC, management interfaces, NTP):
    1. Configuring the SBC 5000 Series Platform
    2. Configuring the SBC 7000 Platform

  6. Install SecureLink for Remote Access

  7. Install SBC Application Software
    1. Installing SBC Application - ERE Configuration
      -or-
    2. Installing SBC Application - ePSX Configuration
  8. Configure SBC for a basic call flow and make first call

 

  • No labels