Use the following steps to mount
Due to the size and weight of the SBC 7000 chassis, at least two people are required when lifting, mounting or unmounting the chassis.
Using six of the supplied #10-32X5/16” flathead Philips screws (three screws per bracket), secure the front fixed mount brackets to the sides of the system.
Install the rear mount support brackets on the sides of the system, extending the rear mount support brackets to 1” less than the measured depth of the rack. Use two to three of the supplied #10-32X5/16” panhead Philips screws for each bracket, depending on rack depth and hole alignment. If your rack is especially deep, you may only be able to secure the rear mount support bracket using only two screws per side.
Lift the system to the desired location in the rack. If top location rack screws have been installed, align top clearance hole in the front mount rack bracket over screw head and install fully flush with rack, sliding screw into obround relief in the bracket.
At the rear of the rack, insert the rear mount brackets into the rear mount support brackets and secure them to the rear of the rack using two of the appropriate screws on each bracket.
Using four of the #10-32 X 5/16” panhead Philips screws (two per side), secure the rear mount brackets to the rear mount support brackets.