Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note
titleBefore You Upgrade

If the SBC Edge (SBC) is running a release prior to Release 3.0, it is required to upgrade the SBC to at least Release 3.0. To upgrade the SBC firmware, follow the instructions from Upgrading or Downgrading SBC 1000/2000.

Overview

This process consists of four steps.

  1. Upgrade the SBC Communication Service (covered in the upgrade notes for Release 3.0).
  2. Upgrade the SBC to Release 3.0 (covered in the upgrade notes for Release 3.0).
  3. Upgrade the ASM Recovery Partition.
  4. Re-initialize the ASM.

 

Process to Upgrade the ASM Image From Windows-only to Lync SBA

Upgrading the SBC Communication service

Upgrade the SBC Communication Service by following the instructions in Upgrading the SBC Communication Service.

Upgrading the SBC

Upgrade the SBC to Release 3.0 or later by following the instructions in the applicable Upgrade Notes under SBC Edge Release Information.

Upgrading the ASM Recovery Partition

Note
titleImportant
  •  Complete the upgrade of the SBC to the latest release as noted above before proceeding with this section.
  • The ASM must be re-initialized after upgrading the ASM Recovery Partition.

...

Note that the existing Windows-only image will not be deleted and will be preserved as an option in the *Application Solution Module Reinitialize* dialog along with the Lync 2010 or 2013 SBA image.

Re-Initializing the ASM

Proceed with the ASM Re-initialization only after the ASM Recovery Partition has been upgraded to the latest ASM image.

Pagebreak