This section provides a checklist of the tasks Use the following pre-installation checklist to prepare a site for the the
Spacevars | ||
---|---|---|
|
...
...
SBC 7000 Pre-Installation Checklist
Task |
---|
...
1 | Review the guidelines given in the safety recommendations |
...
2 | Site power voltages verified |
...
3 | Installation site power check completed |
...
4 | Required hardware tools available |
...
5 | Additional equipment available |
...
6 | SBC 7000 |
...
chassis received | |
7 | SBC 7000 Hardware Installation quick reference received |
...
8 | Rack Space/location |
...
9 | Distance to Power source/Grounding sources |
...
10 | Determine the Fuse size |
11 |
...
Determining the Fuse size
...
Distance to data ports (routers/Switches) |
...
12 | Console connectivity (FSP or serial) requirements |
...
13 | Use a |
...
switch/router that supports RFC5227 (for Link Detection support). NOTE: If switch/router does not support RFC5227, disable probing on Standby port (see SBC Core Redundancy for details). |
...