Use the following pre-installation checklist to prepare a site for the SBC 7000 hardware installation.
SBC 7000 Pre-Installation Checklist
Task | |
---|---|
1 | Review the guidelines given in the safety recommendations |
2 | Site power voltages verified |
3 | Installation site power check completed |
4 | Required hardware tools available |
5 | Additional equipment available |
6 | SBC 7000 chassis received |
7 | SBC 7000 Hardware Installation quick reference received |
8 | Rack Space/location |
9 | Distance to Power source/Grounding sources |
10 | Determine the Fuse size |
11 | Distance to data ports (routers/Switches) |
12 | Console connectivity (FSP or serial) requirements |
13 | Use a switch/router that supports RFC5227 (for Link Detection support). NOTE: If switch/router does not support RFC5227, disable probing on Standby port (see SBC Core Redundancy for details). |