Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Add_workflow_for_techpubs
AUTH1UserResourceIdentifier{userKey=8a00a0c86e9b2550016ec54396b5000a, userName='null'}
JIRAIDAUTHSBX-106097
REV5UserResourceIdentifier{userKey=8a00a02355cd1c2f0155cd26cb8305e9, userName='null'}
REV6UserResourceIdentifier{userKey=8a00a02355cd1c2f0155cd26cb8305e9, userName='null'}
REV3UserResourceIdentifier{userKey=8a00a02355cd1c2f0155cd26cc66080b, userName='null'}
REV1UserResourceIdentifier{userKey=8a00a02355cd1c2f0155cd26cc66080b, userName='null'}


Panel

In this section:

Table of Contents
maxLevel2


Include Page
_SBC 5100 5110 5200 5210 Unsupported
_SBC 5100 5110 5200 5210 Unsupported

Spacevars
0series
systems configured for DC power are equipped with dual redundant DC power supplies (shown in the figure SBC 5000 Series DC Power Supply#DC Power Supply below).

Caption
0Figure
1DC Power Supply
3DC Power Supply


The DC power supply is a Customer Replaceable Unit (CRU). The product codes are:

Caption
0Table
1SBC 5000 series product codes


Ribbon Part NumberProductDC Power SupplyProduct Code
451-01057SBC 510051x0 DC Power Supply (850 Watts) *SBC-51XX-PSUDC
451-01054SBC 5110

51x0 DC Power Supply (850 Watts) *

5110 DC Power Supply (1200 Watts)

SBC-51XX-PSUDC
SBC-5110-PSUDC

451-01057SBC 5200SBC 5200 DC Power Supply (850 Watt)SBC-5200-PSUDC
451-01054SBC 5210SBC 5210 DC Power Supply (1200 Watt)SBC-5210-PSUDC

End of Product Sale as of April 20, 2015


In a dual redundant Power Supply configuration, the Power Supplies are hot-swappable meaning that a Power Supply may be replaced without powering down the 

Spacevars
0series
platform (provided that the redundant Power Supply is operational).


Note
titleImportant
Before replacing a Power Supply in a redundant Power Supply configuration, verify the status of the redundant Power Supply. The “POK” LED status must be “solid green”. Removing the Power Supply when the redundant Power Supply does not show a solid green status, may cause the system to power down. Contact
Spacevars
0company
Customer Support if required.


Caption
0Table
1SBC 5000 series DC power supply states


Power Supply ConditionLED States (Green/Amber)
No DC Power to all PSUOFF
DC present/Standby Outputs ON, Main Output OFF Blinking Green
Power Supply DC Outputs ON and OKSolid Green
Main Output Failure (OCP, OVP, UVP)Blinking Amber
Fan Fail, OTP, Standby Output OCP/UVPSolid Amber


Parts and Tools Required

  • Electrostatic discharge (ESD) strap
  • Replacement DC supply.
  • A #2 Phillips-head screwdriver
  • Torque driver with #2 Phillips bit
  • Voltmeter


Note
The chassis is shipped with one Power Supply, unless a second Power Supply is added to the order.

Include Page
SBXDOC100:ESD_wriststrap_5KSBXDOC100:
ESD_wriststrap_5K

Replacing a Power Supply

Perform the following procedure to replace a Power Supply:

  1. Attach an Electrostatic Discharge (ESD) wrist strap to the ESD grounding point on the back of the chassis, and place the other end around your wrist (see Connecting Electrostatic Discharge Wrist Strap for details).
  2. Disconnect -48VDC power to the DC Power Supply being replaced by shutting off circuit breaker or removing fuse on facilities power distribution panel or similar operation.
  3. Verify the POK LED is off on the DC Power Supply being replaced.
  4. Ensure that power is no longer present on power cables using a voltmeter.
  5. Remove clear plastic protective cover on terminal strip.

    Caption
    0Figure
    1Removing the plastic protective cover


  6. Disconnect RTN and -48V connections by loosening two terminal strip screws using the #2 Philips screwdriver.

    Caption
    0Figure
    1Disconnecting the RTN and -48V connections


  7. Disconnect Chassis Ground connection by removing the screw securing the green chassis ground wire to the DC Power Supply using the #2 Philips screwdriver.
  8. Disengage the DC Power Supply latch by moving the latch to the left.
  9. Pull on the loop handle to slide the DC Power Supply out of the SBC chassis.
  10. Install the replacement DC Power Supply into the
    Spacevars
    0product
    chassis by sliding it forward until the latch clicks in place.
  11. Reconnect the green chassis ground wire to the DC Power Supply using the torque driver supply and tighten the screw to 13.9 in/lb.
  12. Reconnect the RTN and -48V cables to the terminal strip screws and tighten to 13.9 in/lb using the torque driver.
  13. Reinstall the clear plastic protective cover on the terminal strip.
  14. Apply power to the DC Power Supply by turning the circuit breaker or installing the fuse on facilities power distribution panel or similar operation.
  15. Verify that the POK green LED on the newly-replaced Power Supply is solid green.
  16. From the application, verify that no Power Supply alarms are generated. 

CRU Storage

Tooltip
tipESD protective device

All 

Spacevars
0series
CRUs are shipped in electrostatic discharge bags and should be handled using appropriate ESD precautions.

The storage environment for these CRUs is:

  • Humidity must be less than 95% (non-condensing)
  • Temperature must be between -40C and +70C.