This section describes how to prepare for and physically install a Ribbon SBC 1000 system.
The Ribbon SBC 1000 chassis can be installed in a standard 19-inch, 2-post or 4-post equipment rack by attaching the rack mounting ears to the front attachment points on both sides of the chassis.
Attach the 2 rack mounting ears securely to the mounting posts of the equipment rack. Refer to the illustration below for visual details of the installation (click to enlarge).
After you have completed the physical installation of the Ribbon SBC 1000 chassis, connect the grounding wire and power cables
Connect power cords to the power supply and electrical sockets.
DO NOT INSTALL EITHER Ribbon or TELECOM CABLES. You must complete the Initial Configuration before connecting the Ribbon SBC 1000 system to your network.
You are now ready to complete the initial configuration of the Ribbon SBC 1000 system. Proceed to Running Initial Setup.