This section provides a checklist of the tasks to prepare a site for the SBC 7000 hardware installation.
SBC 7000 Pre-Installation Checklist
Task | Notes |
---|
Review the guidelines given in the safety recommendations | ____________________________________________________________ |
Site power voltages verified | ____________________________________________________________
|
Installation site power check completed | ____________________________________________________________
|
Required hardware tools available | ____________________________________________________________
|
Additional equipment available | ____________________________________________________________
|
SBC 7000 received | ____________________________________________________________
|
SBC 7000 Hardware Installation quick reference received | ____________________________________________________________
|
Rack Space/location | ____________________________________________________________
|
Distance to Power source/Grounding sources | ____________________________________________________________
|
Determining the Fuse size | ____________________________________________________________
|
Distance to data ports (routers/Switches) | ____________________________________________________________
|
Console connectivity (FSP or serial) requirements | ____________________________________________________________
|
Use switch/router that supports RFC5227 (for Link Detection support). NOTE: If switch/router does not support RFC5227, disable probing on Standby port (see SBC Core Redundancy for details). | ____________________________________________________________ |