This section provides an example checklist to prepare a site for the 5210 hardware installation. A similar checklist can be used for other SBC 5000 series hardware.
SBC 5210 Pre-installation Checklist
Task | Notes |
---|
Review the guidelines given in the safety recommendations | ______________________________________________________________
|
Site power voltages verified | ______________________________________________________________
|
Installation site power check completed | ______________________________________________________________
|
Required hardware tools available | ______________________________________________________________
|
Additional equipment available | ______________________________________________________________
|
5210 received | ______________________________________________________________
|
5210 Hardware Installation quick reference received | ______________________________________________________________
|
Rack Space/location | ______________________________________________________________
|
Distance to Power source/Grounding sources | ______________________________________________________________
|
Determining the fuse size | ______________________________________________________________
|
Distance to data ports (routers/Switches) | ______________________________________________________________
|
Console connectivity (FSP or serial) requirements | ______________________________________________________________
|