In N:1 Redundancy Group, the M-SBCs must be upgraded first, followed by the S-SBCs.

Note

The procedure to upgrade a Redundancy Group containing two S-SBCs in 1:1 formation is similar to the process of upgrading M-SBC instances. For detailed information, refer to the section Upgrading M-SBC in N:1 Redundancy Group.

  • No labels