In this section:
Perform the following tests, at a minimum, after completing the SBC hardware installation to check power redundancy and cabling, as well as test link lights. Do not test the power redundancy by physically removing a power supply. Never remove a power supply that is powered up. Accomplish the steps below to perform a power redundancy test. Accomplish the steps below to verify cabling and link lights.Power Redundancy Test
Cabling and Link Light Test