This following diagram shows a high-level flow of the SBC 7000 installation sequence, from rack mounting the SBC chassis to placing your first call.
Click a link below to go to an installation task based on your SBC type and configuration options:
Step | Action |
---|---|
1 | |
2 | |
3 | |
4 | Upgrade SBC 7000 BMC firmware (if required) |
5 | |
6 | |
7 | |
8 | Configure SBC for a Basic Call Flow and Make First Call |