In this section:
This section contains information on site planning and requirements for installing the SBC 5400 system.
Site Environmental Requirements
The following table lists the environmental requirements for the SBC 5400 platform.
Site Power Requirements
The following table lists the SBC 5400 system power requirements for both AC and DC power options:
Note
SBCs shipped with AC power supplies include a customer-selectable, country-specific power cord that is chosen during the system quoting process. The example above is a North American power cord (15 amp 125 volt NEMA 5-15P to IEC C19 connector), which is one of the selections.
Overview
Content Tools