In this section:
This section provides details for mounting SBC 5400 chassis in 19 inch 2-post rack.
Align the bottom of the Rack Mount Bracket with the mark on front rail of the rack and secure loosely with (2) #10-32X5/8" Cup Head screws at the top-most and at the bottom-most racking slots. Repeat the same procedure for rear Rack Mount Bracket and the opposite side.
For racks with #12-24, open square, or open round holes, slide #10-32 U-Nut over rail and align concentric with top-most and bottom-most mounting holes with nut portion protruding from inside surface of rail.
Position Rack Rail Guide by centering the center-line etched in the Rack Rail Guide in the center of the rack and secure with (4) #8-32X1/4" Truss Head screws through each Rack Mount Bracket, repeat for the opposite side. Finish securing the Rack Mount Brackets to the rack by tightening the (8) #10-32X5/8" Cup Head screws.
Due to the size and weight of the system, never attempt to install the system by yourself.