Caution

No system configuration changes should be made during an upgrade. If such a change is made, this change is not included in the new software release, and, therefore, the system may not behave as expected.

Warning

Upgrading from more than 2 previous major releases is not supported. For example, the minimum requirement to upgrade to DSC 21.0 is DSC 18.0. 

Before you start the software upgrade, complete the following tasks.

Prerequisites

Workflow

StepActionProcedure
1Before you upgrade the software on your system, it is recommended that you execute the pre-upgrade check procedure provided in this section. This procedure requires about fifteen minutes to complete depending on your system configuration.Execute the Pre-upgrade Checks

2

Ensure that the network is provisioned as required.

DSC 8000 Network Provisioning

3

Collect common system status information.

Collect Common System Status Information

Verify and Record System Status

4

Run a complete system backup and stored the backed up files on another server or a USB key that is accessible.

Back Up Systems

5

Plan sufficient time to complete the upgrade.

The upgrade depends on the number of CPU cards in the system. Each CPU card upgrade requires about 10 minutes.


6

Verify that all system cards are functioning as expected.

Collect Common System Status Information

Verify and Record System Status

7

Verify that the PCE configuration is ready for a software upgrade.

Note: This step is only applicable if you have PCE licensed on your system.

Verifying the PCE Configuration

8

Verify and upload the license. 

Upgrade the DSC 8000 License