SBC 7000 chassis slot 0 contains the Core Server Card (CSC) module which is used for control and data plan processing. The CSC contains two (2) High Availability ports (10G), two (2) Management Ports (10MB/100MB/1G), and Redundant 10G Packet Ports (2 primary + 2 secondary). The CSC product code is SBC-7000-CSC.
The following items are needed to replace a CSC:
Safety shield cover must be intact when system is powered on.
To replace a CSC, do the following:
saveConfig
, which generates the .tar.gz
backup file prior to the replacement. he backup must be taken before performing any operation on the system. For detailed information, refer to Restoring SBC Configuration.Unscrew the thumb screws using #2 Phillips-head screwdriver, open release levers on each side, and pull the CSC module out.
All SBC 7000 CRUs are shipped in electrostatic discharge (ESD) bags and must be handled by using appropriate ESD precautions. The storage environment for these CRUs are:
The ESD Susceptibility symbol warns of the presence of Ribbon devices susceptible to electrostatic discharge. Do not handle equipment without wearing a properly grounded ESD wrist strap.