This section provides a checklist of the tasks to prepare a site for the SBC 7000 hardware installation.

SBC 7000 Pre-Installation Checklist

Task

Notes

Review the guidelines given in the safety recommendations

 

____________________________________________________________

Site power voltages verified


____________________________________________________________

Installation site power check completed


____________________________________________________________

Required hardware tools available


____________________________________________________________

Additional equipment available


____________________________________________________________

SBC 7000 received


____________________________________________________________

SBC 7000 Hardware Installation quick reference received


____________________________________________________________

Rack Space/location


____________________________________________________________

Distance to Power source/Grounding sources


____________________________________________________________

Determining the Fuse size


____________________________________________________________

Distance to data ports (routers/Switches)


____________________________________________________________

Console connectivity (FSP or serial) requirements


____________________________________________________________

Use switch/router that supports RFC5227 (for Link Detection support).

NOTE: If switch/router does not support RFC5227, disable probing on Standby port (see SBC Core Redundancy for details).

 