This following diagram shows a high-level flow of the SBC 5400 installation sequence, from rack mounting the SBC 5400 chassis to placing your first call.
Click a link below to go to an installation task based upon your SBC type and configuration options:
Installation Task | Associated Install Guide Page | |
---|---|---|
1 | Install SBC 5400 chassis into the rack | |
2 | Connect Ethernet and data cables | |
3 | Connect power to the SBC 5400 | |
4 | Configure the SBC platform (BMC, management interfaces, NTP) | |
5 | Install SecureLink | |
6 | Install SBC 5400 Application | |
7 | Configure SBC 5400 for a basic call flow and make first call | How to Set up a Basic Call Flow |