Panel | ||||||
---|---|---|---|---|---|---|
In this section:
|
This section contains information on site planning and requirements for installing the
Spacevars | ||
---|---|---|
|
The following table lists the environmental requirements for the
Spacevars | ||
---|---|---|
|
Caption | ||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||
|
Note | ||
---|---|---|
| ||
* Short-Term is defined as 96 consecutive hours or less and not more than 15 days in a year. |
The following table lists the
Spacevars | ||
---|---|---|
|
Caption | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||
|
Info | ||
---|---|---|
| ||
SBCs shipped with AC power supplies include a customer-selectable, country-specific power cord that is chosen during the system quoting process. The example above is a North American power cord (15 amp 125 volt NEMA 5-15P to IEC C19 connector), which is one of the selections. |
Pagebreak |
---|