Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

borderColorgreen
bgColortransparent
borderWidth2

Back to Table of Contents

Back to Installing SBC 5000 Series Hardware

...

 

This section provides an example checklist to prepare a site for the

Spacevars
0model2
hardware installation. A similar checklist can be used for other 
Spacevars
0series
hardware.

Caption
0Table
1SBC 5210 Pre-installation Checklist

Task

ActionNotes

Review the guidelines given in the safety recommendations


______________________________________________________________

Site power voltages verified


______________________________________________________________ 

Installation site power check completed


 ______________________________________________________________

Required hardware tools available


 ______________________________________________________________

Additional equipment available


 ______________________________________________________________

Spacevars
0model2
received


 ______________________________________________________________

Spacevars
0model2
Hardware Installation quick reference received


 ______________________________________________________________

Rack Space/location


 ______________________________________________________________

Distance to Power source/Grounding sources


 ______________________________________________________________

Determining the fuse size


 ______________________________________________________________

Distance to data ports (routers/Switches)


 ______________________________________________________________

Console connectivity (FSP or serial) requirements


 ______________________________________________________________

...