This section provides a checklist of the tasks to prepare a site for the
hardware installation.
Caption |
---|
0 | Table |
---|
1 | SBC 7000 Pre-Installation Checklist |
---|
|
Task | Notes |
---|
Review the guidelines given in the safety recommendations | ____________________________________________________________ | Site power voltages verified | ____________________________________________________________
| Installation site power check completed | ____________________________________________________________
| Required hardware tools available | ____________________________________________________________
| Additional equipment available | ____________________________________________________________
| SBC 7000 received | ____________________________________________________________
| SBC 7000 Hardware Installation quick reference received | ____________________________________________________________
| Rack Space/location | ____________________________________________________________
| Distance to Power source/Grounding sources | ____________________________________________________________
| Determining the Fuse size | ____________________________________________________________
| Distance to data ports (routers/Switches) | ____________________________________________________________
| Console connectivity (FSP or serial) requirements | ____________________________________________________________
| Use switch/router that supports RFC5227 (for Link Detection support). NOTE: If switch/router does not support RFC5227, disable probing on Standby port (see SBC Core Redundancy for details). | ____________________________________________________________ |
|