Perform the following steps to gracefully shut down the SBC.

  1. Shutdown host power using BMC GUI Power Control.
  2. Shutdown BMC power [SSH to BMC console and execute shutdown -h now command].
  3. Unplug the various connections including the power from the system.
  4. Remove the power supplies and any DSP cards from the chassis.

    Note

    DSP cards can be removed only from SBC 5x10 series chassis.

...

Anchor
Checking Physical Access to the Failed Chassis
Checking Physical Access to the Failed Chassis
Check Physical Access to the Failed Chassis

...

noprint
Caption
0Figure
1Rear Panel LEDs for SBC 5x10 Series
 

 

...

Back to Top

Anchor
Unpacking the Container
Unpacking the Container
Unpack the Container

...

  1. Disconnect the Rack Rear Support from the Rack Adapter Brackets by removing two Philips screws on each side of the

    Spacevars
    0series

    Note

    Do not remove screws attaching the Rack Adapter Brackets to the rack until after removing the 

    Spacevars
    0series
    chassis from the rack.

    Caption
    0Figure
    1Disconnecting Rack Adaptor Brackets

    Image Modified

  2. Supporting the chassis from the bottom, remove the mounting hardware from the front rack ears. Slide the

    Spacevars
    0series
    forward off the Rack Adapter Brackets. Remove the Rack Adapter brackets from the rack by removing the four rack mounting screws, two each side.

    Caption
    0Figure
    1Mounting brackets

Noprint

Back to Top

Anchor
Install the New License
Install the New License
Install the

...

License Bundle

Note

The new license bundle must be applied on the currently standalone active system before powering on the replacement system with your SSD hard drive

...

  1. Locate the chassis grounding studs on the back of the chassis.
  2. Attach the two hole chassis ground lug PN 300-30016 to the 

    Spacevars
    0series
    using two flat washers PN 510-00057, two split lock washers PN 510-00056, and two hex nuts PN 511-00046 as shown in the following figure.

    Caption
    0Figure
    1Chassis grounding lug location

    Image Modified

Anchor
Installing the Power Supplies
Installing the Power Supplies
Install the Power Supplies

...

SSD Received with new Chassis:

  1. Connect the BMC and Management cables. For detailed information, refer to section see Plug the Cables Back section below
  2. Configure the BMC address.     
  3. Update the BMC Firmware. 
  4. Configure the Management port IP addresses. 

  5. Update the BIOS Firmware.

    For more information, see section Firmware Configuration and Upgrade.

     

    Note

    The data on your SSD drive can be become corrupted if the BMC and BIOS versions do not correspond to the

    Spacevars
    0series
    version.

  6. Power off the chassis.

 Insert the Original SSD:

  1. Power off the chassis.
  2. Dismount the SSD drive from the new chassis.
  3. Push your SSD hard drive into the chassis.
  4. Screw in the screw holding the hard drive.
  5. After the 
    Spacevars
    0series
    is rack mounted and the drive is inserted, you must attach the front bezel to the 
    Spacevars
    0series
    by aligning 4 ball studs located on the bezel assembly to the ball stud sockets located on the 
    Spacevars
    0series
    chassis. Apply equal forward pressure to the four corners of the bezel assembly until each of the four corners “click-in”.
  6. Connect the power again. For detailed information, refer to the section Connecting to Power and Power on the Switch.

...

Anchor
plug the cables back
plug the cables back
Plug the Cables Back

...

  1. Insert the end of the power cords to the 
    Spacevars
    0series
    at the rear of the chassis as shown in this figure.
  2. Connect the supplied power cords to the local AC power source. 
  3. Turn on your local AC power source.

    Caption
    0Figure
    1Connecting the AC power supply

    Image Modified

Anchor
Connecting to DC Power and Powering On
Connecting to DC Power and Powering On
Connect to DC Power and Powering On

  1.  Remove the clear plastic terminal cover and re-secure the cover once the following connections have been made, as shown in next figure.
    • Connect Chassis ground to the Green cable
    • Connect Return to the Black cable
    • Connect -48V to the Red cable
  2. Connect the supplied DC power cables to the local DC power source.
  3. Turn on your local DC power source.

    Caption
    0Figure
    1Connecting the DC power supply

    Image Modified

Anchor
Installing the DSP Cards
Installing the DSP Cards
Install the DSP Cards

This is applicable for SBC 5x10 series. For more information on DSP card installation, refer to the sections SBC 5x10 DSP20 Module and SBC 5x10 DSP25 Module.

...

...

Back to Top

Anchor
Firmware Configuration and Upgrade
Firmware Configuration and Upgrade
Firmware Configuration and Upgrade

...

Back to Top
Note

As part of the application install, the system will reboot. After reboot, the standby system starts to sync with the active system automatically. The sync process can take approximately 30 to 40 minutes. The sync and server status can be monitored through CLI/EMA/EMS on the active system.

Noprint

 

Pagebreak