- Pull the AC cord or the fuse for DC, for the TOP power supply. Verify that the server retains power. Plug the cord/fuse back in and wait for the power supply LED to be either blinking or solid green.
- Pull the AC cord or the fuse for DC, for the BOTTOM power supply. Verify that the server retains power. Plug the cord/fuse back in and wait for the power supply LED to be either blinking or solid green.
Cabling and Link Light Test
...