Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This following diagram shows a high-level flow of the 

Spacevars
0model5
installation sequence, from rack mounting the
Spacevars
0model5
 chassis to placing your first call.

Caption
0Figure
1SBC 5400 Install Flowchart

 

Click a link below to go to an installation task based upon your SBC type and configuration options:

 Installation TaskAssociated Install Guide Page
1Install
Spacevars
0model5
chassis into the rack

Rack Mounting the SBC 5400 Chassis

2

Connect Ethernet and data cables

Connecting SBC 5400 Ethernet and Data Cables

3

Connect power to the

Spacevars
0model5

Connecting Power to SBC 5400 and Powering On

4Configure the SBC platform (BMC, management interfaces, NTP)

SBC 5400 - Configuring the Platform

5Install SecureLink

SBC 5400 - Installing SecureLink for Remote Access

6Install 
Spacevars
0model5
 Application

SBC 5400 - Installing Application

7Configure 
Spacevars
0model5
 for a basic call flow and make first call
How to Set up a Basic Call Flow

 

Pagebreak