Perform the following tests, at a minimum, after completing the SBC hardware installation.
Power Redundancy Test
Note |
---|
This test should only be performed when two power supplies are installed in the chassis. |
Warning |
---|
Do not test the power redundancy by physically removing a power supply. Never remove a power supply that is powered up. |
Accomplish the steps below to perform a power redundancy test.
- Pull the AC cord or the fuse for DC, for the TOP power supply. Verify that the server retains power. Plug the cord/fuse back in.
- Pull the AC cord or the fuse for DC, for the BOTTOM power supply. Verify that the server retains power. Plug the cord/fuse back in.
Cabling and Link Light Test
Accomplish the steps below to verify cabling and link lights.
- Verify the MGMT0 and MGMT1 IP ports are cabled and the link lights are green.
- Verify the FSP IP port is cabled and the link light is green.
- Verify the Media Ports are cabled.
- For HA systems, ensure that the HA ports are cabled from Unit 1 to Unit 2, and the link lights are green.