Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Chapter 1

Figure1:  SBC 5110 Rear View

Figure2:  SBC 5110 Front View

Figure3:SBC 5110 Front Panel

Figure4: SBC 5110 Front Panel

 

 

Figure5: SBC 5110 Rear Panel

 

 

 

 

 

 

 

 

  

 

Chapter2: Hardware Installation procedure

 

 

 Figure1: Universal Racking Kit Contents

Figure2: Attaching Chassis Rails and Chassis Rack Ears

Figure3: Rack Markings

 

 

Figure4: 19 Inch 4 Post Rack  

     

 

 

 

Figure5: 23 Inch 4 Post Rack

 

  

 

 

 

 

Figure6: 19 Inch 2 Post Rack

 

 

 

 

Figure7: 23 Inch 2 Post Rack

 

 

 

 Figure8: Attaching to ESD grounding points at the front and rear of the chassis

  

 

 Figure9: Serial port connection

 

 Figure 10: Management and HA Port connection

   

 

 

   Figure 11: Management and HA Port connection

 

  Figure 12: Grounding the switch

 

  Figure 13: AC Power

  

 Figure 14: Terminal connections

Figure15: Removing DC Power Supply

Figure16: Removing AC Power Supply

 

Figure17: Rotating White Pull Tab

 Figure18: Sliding Air Filter

Figure 19:Inserting Air Filter