Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Chapter 1 - Hardware Installation Overview

 

Figure1:SBC 5100 Front View

Figure2: SBC 5100 Rear View

 

Figure3: Japan VCCI Class A ITE Electronics Emission Statement

Figure4: SBC 5100 Front Bezel and LEDs

Figure5: SBC 5100 Front Panel

 

 

 

 

 

 

Figure6: Rear Panel Layout and LEDs

 

Chapter 2 - Hardware Installation Procedure

 

Figure7: Universal Racking Kit Contents 

  

 

 

Figure8: Attaching Chassis Rails and Chassis Rack Ears

 

 

   

Figure9: Rack Markings

Figure10: 19-inch 4 post Rack

 

Figure11: 23-inch 4 post Rack

Figure12: 19-inch 2 post Rack

Figure13: 23-inch 2 post Rack

 

 

Figure14: Attaching to ESD grounding points at the front and rear of the chassis

 

 

 

Figure15: Serial Port Connection

  

Figure16: Management and HA Port connection

 

Figure19: Alarms and connectors

 

Figure20: Grounding the Switch

 

Figure21: AC power

 

Figure22: Terminal connections

 

 

Figure23: Removing DC Power Supply

 

 

Figure24: Removing AC Power Supply

  Figure25: Rotating white pull tab

Figure26: Sliding Air Filter

 Figure27: Inserting Air Filter