SBC Power Requirements

After installing the

Spacevars
0model5
chassis in a rack and attaching necessary cables, you are now ready to install power and ground cables and apply power to the
Spacevars
0model5
. The 
Spacevars
0model5
is capable of dual redundant AC or DC power.

...

  1. Locate the chassis grounding studs on the back of the chassis.
  2. Attach the two hole chassis ground lug PN 300-30016 to the

    Spacevars
    0model5
    using two flat washers PN 510-00057, two split lock washers PN 510-00056, and two hex nuts PN 511-00046 as shown in the following figure.

    Caption
    0Figure
    1Chassis Grounding Lug Location

    Image Modified

  3. Secure the other end of the grounding cable to the earth ground in the building. You can secure the grounding cable to a proper grounding point on the rack, as long as the rack is properly grounded to the earth ground in the building.

...

  1. For each AC power supply, insert the supplied AC power cord female connector to the power supply AC receptacle at the rear of the chassis (shown in the following figure).

    Caption
    0Figure
    1SBC 5400 Chassis AC Power Location

    Image Modified

  2. Connect the supplied power cords to the local AC power source.
  3. Turn on your local AC power source.

...

Caption
0Figure
1 SBC 5400 DC Power Supply Integrated Lever

Image Modified

Caption
0Figure
1 SBC 5400 AC Power Supply Integrated Lever

Image Modified