SBC Power Requirements
After installing the
chassis in a rack and attaching necessary cables, you are now ready to install power and ground cables and apply power to the
. The
is capable of dual redundant AC or DC power.
...
- Locate the chassis grounding studs on the back of the chassis.
Attach the two hole chassis ground lug PN 300-30016 to the
using two flat washers PN 510-00057, two split lock washers PN 510-00056, and two hex nuts PN 511-00046 as shown in the following figure. Caption |
---|
0 | Figure |
---|
1 | Chassis Grounding Lug Location |
---|
|
Image Modified |
- Secure the other end of the grounding cable to the earth ground in the building. You can secure the grounding cable to a proper grounding point on the rack, as long as the rack is properly grounded to the earth ground in the building.
...
For each AC power supply, insert the supplied AC power cord female connector to the power supply AC receptacle at the rear of the chassis (shown in the following figure).
Caption |
---|
0 | Figure |
---|
1 | SBC 5400 Chassis AC Power Location |
---|
|
Image Modified |
- Connect the supplied power cords to the local AC power source.
- Turn on your local AC power source.
...